space_improvements
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
space_improvements [2014/08/20 00:57] – suzuki650xs | space_improvements [2014/08/20 01:09] – suzuki650xs | ||
---|---|---|---|
Line 2: | Line 2: | ||
//You too can make our makerspace!// | //You too can make our makerspace!// | ||
- | | + | If you think of something that you think needs to be done, please add it to this list. Also, please help complete items on this list, if you have the time. |
+ | |||
+ | |||
+ | * Purchase 4x8 sheet of white board (Home Depot, cheap), cut to length to cover back of tool wall. | ||
+ | | ||
+ | * Main door, Laser Cutter, Vinyl Cutter, Welding area, Fridge | ||
* Buy/install flip-down door-stop for main exterior door | * Buy/install flip-down door-stop for main exterior door | ||
- | * Build/find steel welding table - preferably 3' x 5', with ⅛” or ¼" | + | * Create a doorbell. |
+ | * Create a switch in the shop that posts an "Open Shop" message to the internet. | ||
+ | * Install a camera that can post snapshots of the shop to the website. | ||
+ | * Sort hardware in parts bins. | ||
+ | * Re-label tool drawers - reorganize if necessary. | ||
* Buy/install 4x4 post to replace loft tree/log on outer corner of loft | * Buy/install 4x4 post to replace loft tree/log on outer corner of loft | ||
* < | * < | ||
* Install barrel bolts to side posts (top and bottom) to keep stable. | * Install barrel bolts to side posts (top and bottom) to keep stable. | ||
- | * Build Welding Screen | + | * Build a frame for the welding curtain. (Can be out of metal or wood. Should collapse somewhat so it can be easily stored or tucked away. |
* Install better lights under loft | * Install better lights under loft | ||
* Reinforce fencing railing in loft | * Reinforce fencing railing in loft | ||
- | * Build legs for electronics | + | * Take white painted board in loft area, add legs to make an electronics |
* Build shelf to be attached to and go over electronics bench. | * Build shelf to be attached to and go over electronics bench. | ||
+ | * Find/ | ||
* Attach metal vise and bench grinder | * Attach metal vise and bench grinder | ||
Line 19: | Line 30: | ||
* 2 Large Garbage Cans | * 2 Large Garbage Cans | ||
* 4” x 4” x 8’ post for corner of loft | * 4” x 4” x 8’ post for corner of loft | ||
- |
space_improvements.txt · Last modified: 2024/02/16 14:11 by mpickhard