space_improvements
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
space_improvements [2014/08/20 01:09] – suzuki650xs | space_improvements [2014/08/25 23:56] – karenc | ||
---|---|---|---|
Line 15: | Line 15: | ||
* Re-label tool drawers - reorganize if necessary. | * Re-label tool drawers - reorganize if necessary. | ||
- | * Buy/install 4x4 post to replace loft tree/log on outer corner of loft | + | * <del>Buy/install 4x4 post to replace loft tree/log on outer corner of loft</ |
* < | * < | ||
- | * Install barrel bolts to side posts (top and bottom) to keep stable. | + | * <del>Install barrel bolts to side posts (top and bottom) to keep stable.</ |
* Build a frame for the welding curtain. (Can be out of metal or wood. Should collapse somewhat so it can be easily stored or tucked away. | * Build a frame for the welding curtain. (Can be out of metal or wood. Should collapse somewhat so it can be easily stored or tucked away. | ||
* Install better lights under loft | * Install better lights under loft | ||
Line 23: | Line 23: | ||
* Take white painted board in loft area, add legs to make an electronics table. | * Take white painted board in loft area, add legs to make an electronics table. | ||
* Build shelf to be attached to and go over electronics bench. | * Build shelf to be attached to and go over electronics bench. | ||
- | * Find/ | + | * Use door to create a craft table to go along the south fence in the loft |
* Attach metal vise and bench grinder | * Attach metal vise and bench grinder | ||
Line 29: | Line 29: | ||
* 2 Large Garbage Cans | * 2 Large Garbage Cans | ||
- | * 4” x 4” x 8’ post for corner of loft |
space_improvements.txt · Last modified: 2024/02/16 14:11 by mpickhard