User Tools

Site Tools


to_do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
to_do_list [2014/08/17 15:58] karencto_do_list [2014/08/20 01:11] (current) – removed suzuki650xs
Line 1: Line 1:
-====== To Do ====== 
  
-Create by members, for members. If you think of something that you think needs to be done, please add it to this list. Also, please help complete items on this list, if you have the time. 
- 
-  * Purchase 4x8 sheets of white board and cover back of tool wall. 
-  * Build a frame for the welding curtain. (Can be out of metal or wood. Should collapse somewhat so it can be easily stored or tucked away. 
-  * Move old welding bench to back wall of tool crib. 
-       *Rebuild bench so that it is solid 
-       * Move parts bins to tool bench 
-   * Sort hardware in parts bins. 
-   * Take door looking thing in loft and turn it into an electronics table. 
-       * Build shelf with back over electronics table. 
-   * Find/purchase a surface(door, plywood, etc.) and create a craft table to go along the south fence in the loft. 
-   * Replace loft support with proper 4x4. 
-   * Relabel tool drawers - reorganize if necessary. 
-   * Create a doorbell. 
-   * Create a open shop switch that posts to the internet. 
-   * Install a camera that can post snapshots of the shop to the website. 
to_do_list.1408291122.txt.gz · Last modified: 2022/05/29 16:01 (external edit)