to_do_list
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
to_do_list [2014/08/17 22:35] – suzuki650xs | to_do_list [2014/08/20 01:11] (current) – removed suzuki650xs | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== To Do ====== | ||
- | Create by members, for members. If you think of something that you think needs to be done, please add it to this list. Also, please help complete items on this list, if you have the time. | ||
- | |||
- | * Purchase 4x8 sheet of white board (Home Depot, cheap), cut to length to cover back of tool wall. | ||
- | * Build a frame for the welding curtain. (Can be out of metal or wood. Should collapse somewhat so it can be easily stored or tucked away. | ||
- | * Sort hardware in parts bins. | ||
- | * Take white painted board in loft area, add legs to make an electronics table. | ||
- | * Build shelf with back over electronics table. | ||
- | * Find/ | ||
- | * Replace loft support with proper 4x4. | ||
- | * Re-label tool drawers - reorganize if necessary. | ||
- | * Create a doorbell. | ||
- | * Create an "Open Shop" switch in the shop that posts to the internet. | ||
- | * Install a camera that can post snapshots of the shop to the website. |
to_do_list.1408314925.txt.gz · Last modified: 2022/05/29 16:01 (external edit)